
Prosch
The following is a tentative schedule for roadwork for the City of Portsmouth: Columbia Gas of Ohio will continue work on their gas main line replacement projects affecting several city streets; service installation on 3rd Street from Offnere to Brown, road will be closed in sections; surface restoration on 3rd and 4th Street from Offnere to Brown, road will be closed in sections; main line installation on Coles Blvd. between Sherman and Howard, flaggers will be used to maintain traffic, Howard Street will be closed towards the end of the week. R&R Pipeline, Inc. will be performing the work.
The City of Portsmouth will be crack sealing several city streets as part of the preventative maintenance project. The following is a list of streets to be crack sealed this week.
Street name | from | to | |
2nd Street | Waller Street | Offnere Street | |
Elmwood Drive | 23rd Street | 25th Street | |
Front Street | Glover Street |
|
|
Grandview Avenue | 25th Street | Dorman Drive | |
Mabert Road | U.S. 52 | 17th Street | |
Oakland Blvd. | All | All | |
Offnere Street | Mill Street | Gallia Street | |
Sunrise Avenue | Top of Hill | Coles Blvd. | |
Winchester Street (Sciotoville) | Gallia Street | Harding Avenue |
Strawser Construction, Inc. will be performing the work.
Nathan Prosch, P.E., S.I. is the City Engineer of Portsmouth, Ohio. He can be reached at 740-354-7557 or [email protected]