Road Report


Staff Report



COUNTY CREW WORK

Mt. Carmel Road (CR212) in Madison Township: Monday, November 6th at the 1.746, 2.168 and 2.434 mile markers; Tuesday, November 7th at the 2.367 and 2.785 mile markers and Wednesday, November 8th at the 2.491, 2.641 and 2.900 mile markers will be closed from 7:00 A.M. to 5:00 P.M. The location of the closures is between Jacobs Road and Salem Road. County Engineer’s crew will be installing new culverts.

Turkey Foot Road (CR5) in Vernon Township: Monday, November 6th at the 2.791 and 3.164 mile markers and Tuesday, November 7th at the 4.189 and 4.235 mile markers will be closed from 7:00 A.M. to 5:00 P.M. The location of the closure is between Germany Hollow Road and Lick Run – Lyra Road. County Engineer’s crew will be installing new culverts.

Tick Ridge – Koenig Hill Road (CR42) in Brush Creek Township: Monday, November 6th at the 4.113, 4.355 and 4.752 mile markers; Tuesday, November 7th at the 4.898 and 5.052 mile markers and Wednesday, November 8th at the 5.123 and 5.343 mile markers will be closed from 7:00 A.M. to 5:00 P.M. The location of the closure is between Thompson Hill Road and Rocky Fork Road. County Engineer’s crew will be installing new culverts.

Haverhill – Ohio Furnace Road (CR8) in Green Township on Wednesday, November 8th at the 0.260 mile marker will be closed from 7:00 A.M. to 11:00 A.M. The location of the closure is between Gallia Pike and U. S. Route 52. County Engineer’s crew will be installing a new culvert.

VETERANS MEMORIAL HIGHWAY IMPACTS

INTERMITTENT FLAGGING

Blue Run Road (CR29) in Jefferson Township continues with intermittent flagging through Friday, December 22nd. Portsmouth Joint Venture will be doing deck work activities on bridge 12. The location of work is near the intersection with Flowers – Ison Road (TR381).

Swauger Valley Road (CR31) in Harrison Township continues with intermittent flagging through Friday, December 22nd. Portsmouth Joint Venture will be doing deck work activities on bridge 9. The location of the work is between South Street (TR1015) and Shumway Hollow (TR234).

TEMPORARY CLOSURE

Slocum Avenue in Porter Township continues with temporary fifteen (15) minute closures through Saturday, November 11th at 5:00 P.M. Portsmouth Joint Venture is moving beams for staging on bridge 6. No lanes will be open during the moving of the beams.