Darren C. LeBrun, P.E., P.S., Scioto County Engineer, announced the work schedule for the week of May 29, 2017 through June 2, 2017 for the Engineer’s Department.

COUNTY CREW WORK

CULVERT REPLACEMENT

Bonser’s Run Road (CR168) in Harrison Township at the 4.754 mile marker will be closed Tuesday, May 30th andn Wednesday, May 31st day and night. The location of the closure is between Whitley Lane and Hutchinson Road. County Engineer’s crew will be installing a concrete pipe.

BERMING (weather permitting)

Sheldon – Cartro Road (CR308) in Green and Vernon Townships, Tuesday, May 30th will have lane restrictions from 7:00 A.M. to 5:00 P.M. Traffic will be maintained with the use of flaggers.

Frederick Road (CR17) in Bloom and Harrison Townships, Wednesday, May 31st will have lane restrictions from 7:00 A.M. to 5:00 P.M. Traffic will be maintained with the use of flaggers.

Laurel Lick Road (CR63) in Bloom Township, Thursday, June 1st will have lane restrictions from 7:00 A.M. to 5:00 P.M. Traffic will be maintained with the use of flaggers.

MOWING

Houston Hollow – Long Run Road in Clay and Jefferson Townships.

Rosemount – Selby Road in Clay Township.

Woods Ridge Road in Clay and Harrison Townships.

Rarden – Hazelbaker Hill Road in Rarden Township.

Lucasville – Minford Road in Jefferson, Madison and Valley Townships.

Piketon Road in Madison Township.

ROAD IMPROVEMENT

Allard Excavation will be raising manholes and water valves on Washington Boulevard (CR50) in Washington Township Tuesday, May 30th through Friday, June 2nd from 7:00 A.M. to 6:00 P.M. each day. Inclusive in the work will be the intersections of sub-division streets at Washington Boulevard. Local traffic will be maintained.

VETERANS MEMORIAL HIGHWAY IMPACTS

ROAD CLOSURES

Flatwood – Fallen Timber Road (CR184) in Jefferson Township at the 0.56 to 1.03 mile markers continues to be closed through Thursday, December 1st, 2017. Portsmouth Joint Venture is excavating road embankment for construction of State Route 823 and constructing a bridge.

Ohio River Road (CR503) in Porter Township is continuing with single lane traffic through Thursday, June 1st. Portsmouth Joint Venture is constructing mechanically stabilized earth (MSE) walls and completing a full width reconstruction of the roadway. Hastings Hill Road is fully open to traffic during the closure with single lane flagging to facilitate permanent shoulder construction along Ohio River Road.

Lucasville – Minford Road (CR28) in Madison Township continues to be closed through Tuesday, August 1st day and night. The closure allows Portsmouth Joint Venture to do mass excavation activities and reconstruction of Lucasville – Minford Road. The location is between Flowers – Ison Road (TR381) and Rases Mountain Drive (TR1570). Rases Mountain Drive is now open to thru traffic at the intersection with Lucasville – Minford Road.

Swauger Valley – Minford Road (CR31) in Harrison Township continues to have flagging operations through Saturday, June 17th. The location of the flagging is between Bond Road (TR232) and Shumway Hollow (TR234). Flaggers will be utilized to stop traffic for Artic truck crossing and construction access into the SR-823 right of way.